2021
DOI: 10.1016/j.soildyn.2021.106904
|View full text |Cite
|
Sign up to set email alerts
|

Three-dimensional seismic performance analysis of large and complex underground pipe trench structure

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 22 publications
(4 citation statements)
references
References 17 publications
0
4
0
Order By: Relevance
“…To consider the soil-tunnel contact relationship at the interface, the shield tunnel segments and soil are usually set as interaction contact surfaces to account for contact discontinuity between the shield tunnel and the surrounding soil medium and any possible compression, separation, or sliding of these structural components from the surrounding soil under seismic excitation [32]. Contact surfaces consisting of master and slave surfaces were defined to implement the contact pair method.…”
Section: Surrounding Rock-tunnel Interaction Boundary Conditions and ...mentioning
confidence: 99%
See 2 more Smart Citations
“…To consider the soil-tunnel contact relationship at the interface, the shield tunnel segments and soil are usually set as interaction contact surfaces to account for contact discontinuity between the shield tunnel and the surrounding soil medium and any possible compression, separation, or sliding of these structural components from the surrounding soil under seismic excitation [32]. Contact surfaces consisting of master and slave surfaces were defined to implement the contact pair method.…”
Section: Surrounding Rock-tunnel Interaction Boundary Conditions and ...mentioning
confidence: 99%
“…The maximu internal force of the shield tunnel under different assembly methods is shown in Figu 12, taking a 0.1 g earthquake as an example under different assembly methods. The ma imum radial axial force of CF45 is 126.9 kN, and the minimum of CF90 is 112.6 kN, wi Considering the structural stress characteristics and based on previous research experience [32], the maximum principal stress (MAPS) and the minimum principal stress (MIPS) were selected for stress characteristic analysis. MAPS is primarily used to evaluate the tensile failure location of the tunnel, while MIPS is primarily used to evaluate the compression failure location of the tunnel.…”
Section: Mechanical Behavior Of Shield Tunnel Joints Under Different ...mentioning
confidence: 99%
See 1 more Smart Citation
“…However, as the complexity and detail of pipeline BIM models increase, along with the numerous pipeline variants [15], challenges arise. These challenges are intensified by tight pipeline configurations, overlapping pipeline segments, and complex interactions with other infrastructure elements [16][17][18]. Therefore, rendering pipeline BIM models presents significant challenges.…”
Section: Introduction 1backgroundmentioning