2021
DOI: 10.1108/ijppm-05-2020-0259
|View full text |Cite
|
Sign up to set email alerts
|

Theoretical model for identifying market development indicators

Abstract: PurposeThe purpose of this paper is to develop a theoretical model composed of performance indicators divided into stages that represent a chronological order of the market development process.Design/methodology/approachThe theoretical model presented by this paper was developed based on the information collected through three systematic reviews. The first review identified the steps that segment the market development process. The second and third systematic review sought to identify a set of indicators that … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 65 publications
0
4
0
Order By: Relevance
“…In this study, the current component failure probability and the component state at the previous stage need to be considered when sampling the current state, and it is assumed that the component repairs are completed within tr hours after the typhoon warning, and thereafter the typhoon failure probability is 0 whilst the power supply is restored. The component state at time t can be calculated by Equation (22). The lines and towers are regarded as a series system, and the normal operation of the transmission lines requires all lines and towers to operate normally.…”
Section: Contingency Set Generation Strategy Considering Time Seriesmentioning
confidence: 99%
See 1 more Smart Citation
“…In this study, the current component failure probability and the component state at the previous stage need to be considered when sampling the current state, and it is assumed that the component repairs are completed within tr hours after the typhoon warning, and thereafter the typhoon failure probability is 0 whilst the power supply is restored. The component state at time t can be calculated by Equation (22). The lines and towers are regarded as a series system, and the normal operation of the transmission lines requires all lines and towers to operate normally.…”
Section: Contingency Set Generation Strategy Considering Time Seriesmentioning
confidence: 99%
“…In the research of resilience assessment methods and indicators, some indicators describing the power grid usually include economic indicators [22], reliability indicators [23], and system stability indicators [24]. The typical performance transitions of a power grid facing disturbance events were often divided into the pre-disaster prevention stage, the mid-disaster resistance stage, and the post-disaster recovery stage [25,26].…”
Section: Introductionmentioning
confidence: 99%
“…trade shows, trade missions and seminars. In their research, Gerhardt et al (2021) have developed a theoretical model of the market development process in three stages with different performance indicators at each stage. Kaleka and Morgan (2019) have also found in their research that exporting manufacturers seem to adopt a long-term stance in planning their overseas activities.…”
Section: Market Development In a Local Business Contextmentioning
confidence: 99%
“…trade shows, trade missions and seminars. In their research, Gerhardt et al. (2021) have developed a theoretical model of the market development process in three stages with different performance indicators at each stage.…”
Section: A Theoretical Frameworkmentioning
confidence: 99%