2017
DOI: 10.1016/j.jlp.2016.11.009
|View full text |Cite
|
Sign up to set email alerts
|

The vulnerability of industrial equipment to tsunami

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2017
2017
2020
2020

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 20 publications
(10 citation statements)
references
References 24 publications
0
10
0
Order By: Relevance
“…A large amount of data is required to actually apply the multi-hazard PSA methodology proposed in this study. Since the Fukushima nuclear accident in 2011, as the awareness of a multi-hazard event has increased, many studies have been conducted to date [1,21]. In addition, one study was conducted on the quantification of dependencies between components in nuclear facilities in the event of an external hazard [14].…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…A large amount of data is required to actually apply the multi-hazard PSA methodology proposed in this study. Since the Fukushima nuclear accident in 2011, as the awareness of a multi-hazard event has increased, many studies have been conducted to date [1,21]. In addition, one study was conducted on the quantification of dependencies between components in nuclear facilities in the event of an external hazard [14].…”
Section: Discussionmentioning
confidence: 99%
“…Recent events worldwide have demonstrated that natural hazards cannot be neglected in evaluating the risk of industrial facilities. Accordingly, several studies have been conducted related to natural hazard risk assessment [1][2][3][4]. Basco and Salzano [1] analyzed the hazards related to tsunamis and their impact on the industrial equipment tanks.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…This work was later enriched with studies focusing on possible domino effects and Natech events, to address the challenges related to CIPs. Seismic and flood vulnerability curves have been developed in some studies [69,75,76]. However, a single parameter cannot show the damage behavior due to complex disturbances.…”
Section: Vulnerability Assessmentmentioning
confidence: 99%
“…The impact of natural hazards on the accident or release scenarios and frequencies is given in Table 1. These frequencies have been calculated by taking into account the methodology described in several previous works (Salzano et al 2015;Basco and Salzano 2016). The vulnerability of the equipment has been assessed with respect to the intensity of the natural events by taking into account the construction characteristics of equipment and, more importantly, the new limit states based on the release of content.…”
Section: Assessment Phasementioning
confidence: 99%