2007
DOI: 10.1080/00207540600920884
|View full text |Cite
|
Sign up to set email alerts
|

The value of the shortest loop covering all work centers in a manufacturing facility layout

Abstract: In this study we develop mathematical models to design circular material flow systems. We first develop a tight formulation to find the shortest loop covering all work centers within a manufacturing facility layout. The shortest loop is an attractive solution for most types of conveyors and power-and-free systems, where the length of the flow path is the major driver of the total cost. We develop a primal as well as a dual graph formulation and discuss their one-to-one correspondence in node-edge as well as in… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2015
2015
2021
2021

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 21 publications
0
1
0
1
Order By: Relevance
“…As mentioned, the models to find the shortest loop in a given layout were proposed by several studies [23,24,40,41]. In this study, searching for the shortest loop in the layout should proceed in every iteration of the layout design process.…”
Section: Parameters and Variables Nmentioning
confidence: 99%
“…As mentioned, the models to find the shortest loop in a given layout were proposed by several studies [23,24,40,41]. In this study, searching for the shortest loop in the layout should proceed in every iteration of the layout design process.…”
Section: Parameters and Variables Nmentioning
confidence: 99%
“…Namun, diperlukan biaya tambahan ketika pabrik melakukan renovasi pabrik yang disesuaikan dengan layout alternatif terpilih hal ini dikarenakan bahwa biaya yang dikeluarkan seperti biaya fixed cost, variabel cost, overhead dan upah tenaga kerja cenderung sama waaupun ada selisih biaya tidak akan terlalu jauh. Karena layout alternatif terpilih berfungsi atau dilakukan agar produktivitas pabrik dapat meningkat namun dengan tanpa terjadi penambahan biaya produksi serta mengurangi material handling dan backtracking sehingga pabrik dapat bekerja lebih efektif dan efisien (Vaziri and Ortiz, 2008). Analisa Layout yang Pertama Layout pertama merupakan relayout berdasarkan hasil pengolahan ARC dan ARD.…”
Section: Activity Based Cost (Abc)unclassified