The third comprehensive survey on scheduling problems with setup times/costs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
214
0
11

Year Published

2017
2017
2020
2020

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 413 publications
(239 citation statements)
references
References 388 publications
1
214
0
11
Order By: Relevance
“…(3) Performance criteria and scheduling objectives. In the traditional workshop, the scenario is usually that factories schedule their own machines, and thus the scheduling objective is usually how to minimise the makespan and flow times without concerning cost and quality (Allahverdi 2015). However, in cloud manufacturing, due to resources are owned by different enterprises, many other metrics such as cost, quality, service evaluation, and enterprise reputation need also to be considered.…”
Section: Workhop Schedulingmentioning
confidence: 99%
See 1 more Smart Citation
“…(3) Performance criteria and scheduling objectives. In the traditional workshop, the scenario is usually that factories schedule their own machines, and thus the scheduling objective is usually how to minimise the makespan and flow times without concerning cost and quality (Allahverdi 2015). However, in cloud manufacturing, due to resources are owned by different enterprises, many other metrics such as cost, quality, service evaluation, and enterprise reputation need also to be considered.…”
Section: Workhop Schedulingmentioning
confidence: 99%
“…A great variety of issues have been addressed, including single machine scheduling, parallel machine scheduling, flow shop and flexible flow shop scheduling, job shop scheduling, open shop scheduling and many different models, deterministic or stochastic, have been built (Allahverdi 2015). Many approaches have been proposed, from the early mathematical programming (Blazewicz, Dror, and Weglarz 1991) and branch-and-bound technique (Brucker, Jurisch, and Sievers 1994) for smallsize problems to various approximation methods such as local search (Vaessens, Aarts, and Lenstra 1996) and AI (Wang 2005;Çaliş and Bulkan 2015), etc.…”
Section: Workhop Schedulingmentioning
confidence: 99%
“…This gap has also existed in optimization models as well as another field of engineering (Ehrgott et al, 2014;Gabrel et al, 2014;Goerigk & Schöbel, 2015;Wang & Shan, 2007). (Ghodratnama et al, 2015) √ √ √ √ √ √ 16 (Pishvaee & Fazli Khalaf, 2016 (Gul & Zoubir, 2017) √ √ √ 33 (Goerigk & Schöbel, 2015) √ √ √ √ √ 34 (Gorissen, 2015) √ √ √ √ √ √ 35 (Liu et al, 2015) √ √ √ √ 36 (Sun et al, 2015) √ √ √ 37 √ √ √ √ 38 (Wu , 2015) √ √ √ √ √ 39 (Khan et al, 2015) √ √ √ 40 (Park, 2016) √ √ √ 41 (Goberna et al, 2015) √ √ √ √ 42 √ √ √ 43 (Wang & Pedrycz, 2015) √ √ √ √ √ 44 (Yu & Zeng, 2015) √ √ √ 45 (Asafuddoula et al, 2015) √ √ √ √ √ √ 46 (Dellino et al, 2015) √ √ √ √ √ √ √ √ √ 47 (Auzins et al, 2015) √ √ √ √ √ √ 48 (Cao et al, 2015) √ √ √ √ √ √ 49 (Ng et al, 2015) √ √ √ √ √ √ √ 50 (Allahverdi, 2015) √ √ …”
Section: Discussionmentioning
confidence: 99%
“…Herroelen and Leus (2004) and (2005) in two different comprehensive review papers have tried to investigate the methods of reactive and proactive scheduling project under uncertain conditions. In addition, recent survey on scheduling problems based on time and cost can be found in (Allahverdi, 2015). …”
Section: Production and Project Management Under Uncertaintymentioning
confidence: 99%
“…Recently, Rossi (2014) investigate the SDST-FJSP with transportation times using ant-colony algorithm with reinforced pheromone. The most recent comprehensive survey of scheduling problem with setup times is given by Allahverdi (2015).…”
Section: Introductionmentioning
confidence: 99%