2015
DOI: 10.4236/eng.2015.75021
|View full text |Cite
|
Sign up to set email alerts
|

The Suitability of Typhoon Disaster Reconstruction Work Planning—A Case of Meizuolyu Stream in Taitung County

Abstract: Due to effects of succession typhoons and heavy rainfall, central government often invests the funds within shortest time of contingency promptly after disaster occurring to handle the planning and design project of taking precautions against natural disaster. Because the time limit of design project operating so generally were planned without many detail investigations, it was necessary to probe into the project effect and reconstruction security behind constructed. In this study, we choose the Meizuolyu stre… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…The present study performed channel tests to simulate closed CDs, SDs, steel pipe dam (SPDs), and steel pipe plus slit dam (SPSDs) 50-year 100-year floods. Results were then analyzed to determine the sediment trapping (ST) effects of various CDs, the effects of "adjustable CDs", and the changes of moderated riverbeds [12]- [15].…”
Section: Introductionmentioning
confidence: 99%
“…The present study performed channel tests to simulate closed CDs, SDs, steel pipe dam (SPDs), and steel pipe plus slit dam (SPSDs) 50-year 100-year floods. Results were then analyzed to determine the sediment trapping (ST) effects of various CDs, the effects of "adjustable CDs", and the changes of moderated riverbeds [12]- [15].…”
Section: Introductionmentioning
confidence: 99%