2020
DOI: 10.1016/j.catena.2020.104678
|View full text |Cite
|
Sign up to set email alerts
|

The potential for soil erosion control associated with socio-economic development in the hilly red soil region, southern China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
16
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 48 publications
(17 citation statements)
references
References 45 publications
0
16
0
Order By: Relevance
“…In red soil, nitrogen loss is high due to local rainfall patterns and soil erosion 6 , 7 . Many researchers have reported that more precise control of the total amount of applied nitrogen fertilizer could be an important measure for decreasing soil nitrogen loss 8 , 9 and the apparent nitrogen balance (the positive or negative value calculated from nitrogen input minus nitrogen uptake).…”
Section: Introductionmentioning
confidence: 99%
“…In red soil, nitrogen loss is high due to local rainfall patterns and soil erosion 6 , 7 . Many researchers have reported that more precise control of the total amount of applied nitrogen fertilizer could be an important measure for decreasing soil nitrogen loss 8 , 9 and the apparent nitrogen balance (the positive or negative value calculated from nitrogen input minus nitrogen uptake).…”
Section: Introductionmentioning
confidence: 99%
“…The relative changes in the USLE_P conservation practice factor of the USLE in Table 2 were adopted from a calibrated SWAT model for this area (Chen et al, 2013), which maintained the same value over five years. The economic data for these BMPs were estimated by Wang (2008) according to the price standard adopted 15 years ago. Although this is no longer applicable to the current price standards, it is still suitable for evaluating the relative net cost among the BMP scenarios.…”
Section: Bmp Knowledge Basementioning
confidence: 99%
“…The economic data for these BMPs were estimated by X. Wang (2008) according to the price standard adopted 15 years ago. Although this is no longer applicable to the current price standards, it is still suitable for evaluating the relative net cost among the BMP scenarios.…”
Section: Experimental Designmentioning
confidence: 99%