2019
DOI: 10.1016/j.trpro.2019.07.051
|View full text |Cite
|
Sign up to set email alerts
|

The Possibility of Utilising Maximum Capacity of the Double-Track Railway By Using Innovative Traffic Organisation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(3 citation statements)
references
References 2 publications
0
2
0
1
Order By: Relevance
“…Overall, the maximum number of trains that can be in the network, and the line capacity, depends on technical factors such as headway, signalling, infrastructure and rolling stock; and on operations factors such as operation pattern [14], route itinerary and type of services [15][16][17]. Line capacity in a real operation is complex and involves a number of factors [18][19][20]. These include the infrastructure (single or double track, the number of platforms, platform length, distance between stations, line speed restrictions, radius, gradient, and turnout).…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Overall, the maximum number of trains that can be in the network, and the line capacity, depends on technical factors such as headway, signalling, infrastructure and rolling stock; and on operations factors such as operation pattern [14], route itinerary and type of services [15][16][17]. Line capacity in a real operation is complex and involves a number of factors [18][19][20]. These include the infrastructure (single or double track, the number of platforms, platform length, distance between stations, line speed restrictions, radius, gradient, and turnout).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The design of a signalling system is related to the track occupation of a train [21]. In addition, rolling stock information such as tractive force, numbers of engines, braking characteristics influenced train movements and line capacity in this case [19]. In order to increase the line capacity, different schemes can be used, such as reducing the dwell time, rearranging the station locations, adjusting the train speed, or installing additional signaling equipment [11,22].…”
Section: Literature Reviewmentioning
confidence: 99%
“…и другие направления. Изменение инфраструктурных и эксплуатационных параметров железнодорожных линий и их влияние на пропускную и провозную способность рассмотрено и в современных зарубежных исследованиях [2][3][4][5][6].…”
Section: Introductionunclassified