2015
DOI: 10.7250/bfpcs.2015.005
|View full text |Cite
|
Sign up to set email alerts
|

The Novel Updates of the Hydrogeological Model of Latvia

Abstract: -In 2010-2012, the hydrogeological model (HM) of Latvia (LAMO) was established by the scientists of Riga Technical University (RTU). LAMO is run by the commercial program Groundwater Vistas (GV). LAMO has generalized the geological and hydrogeological data that were provided for the active groundwater zone by the Latvian Environment, Geology and Meteorology Centre (LEGMC). In 2013-2014, LAMO was notably upgraded and a large amount of real hydrogeological data were added. In 2015, new improvements of LAMO were … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
2
0
4

Year Published

2015
2015
2019
2019

Publication Types

Select...
4

Relationship

4
0

Authors

Journals

citations
Cited by 4 publications
(6 citation statements)
references
References 8 publications
0
2
0
4
Order By: Relevance
“…Laikā no 2011. gada līdz 2015. gadam Rīgas Tehniskās universitātes (RTU) zinātnieki izveidoja šobrīd izmantoto LAMO4 kā HM pilnveidošanas (LAMO1→ LAMO2→ LAMO3→ LAMO4) procesa rezultātu. LAMO projekta gaita ir iztirzāta rakstos [5] un [6]. Modeļa veidošanai izmantotās oriģinālās matemātiskās metodes ir izskaidrotas darbā [7].…”
Section: Att ģEoloģiskais Griezums R-m-n-z Arunclassified
See 1 more Smart Citation
“…Laikā no 2011. gada līdz 2015. gadam Rīgas Tehniskās universitātes (RTU) zinātnieki izveidoja šobrīd izmantoto LAMO4 kā HM pilnveidošanas (LAMO1→ LAMO2→ LAMO3→ LAMO4) procesa rezultātu. LAMO projekta gaita ir iztirzāta rakstos [5] un [6]. Modeļa veidošanai izmantotās oriģinālās matemātiskās metodes ir izskaidrotas darbā [7].…”
Section: Att ģEoloģiskais Griezums R-m-n-z Arunclassified
“…Versijām LAMO3 un LAMO4, izmantojot urbumu atsūknēšanas mērījumu datus, tika precizētas k kartes [18].…”
Section: Att ģEoloģiskais Griezums R-m-n-z Arunclassified
“…These links control the interaction of the HM body with the rivers and lakes. In LAMO4, the elements of Grivers have been adjusted by accounting for data provided by the real measurements of the river streams [2]. For the particle tracking, the six groundwater flows (computed by MODFLOW) that pass through the faces of each finite-difference cell (h × h × m) of HM were applied.…”
Section: Mathematical Formulationsmentioning
confidence: 99%
“…The GV program is used for running LAMO [1]. In 2013-2015, LAMO was considerably updated [2], [3]. In 2015, the latest LAMO4 version was developed.…”
Section: Introductionmentioning
confidence: 99%
“…Pat ja senāk piesārņojuma koncentrācija pazemes ūdenī bijušajā mazuta bāzē daudzkārt pārsniedza pašreiz novēroto, bāzes piesārņojums nevar ietekmēt Gaujas upi, jo tās rezultējošā pazemes pietece pie Valmieras ir 1200 · 10 3 m 3 /dnn [16]. Ievērojot virszemes pieteci, upes vidējā gada caurtece pie Valmieras ir vismaz 1200 · 10 3 · 3 = 3600 · 10 3 m 3 /dnn.…”
unclassified