2019 IEEE 7th International Conference on Smart Energy Grid Engineering (SEGE) 2019
DOI: 10.1109/sege.2019.8859915
|View full text |Cite
|
Sign up to set email alerts
|

The Masterplan for Developing Electricity Systems for Archipelagic Area by Considering Local Energy Resources: A Case Study of Maluku Islands

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 2 publications
0
5
0
Order By: Relevance
“…The workflow of the assessment is shown in Figure 4. The data needed to assess the power system planning include the existing transmission system, the load forecasting result, the additional generating unit, and the proposed transmission line candidates, which are provided by the previous study [4,8]. After all of the data are collected, the power system is then modeled for a particular year in the commercial power system simulation package DIgSILENT PowerFactory [33], the user interface of which is presented in Figure 5.…”
Section: Transmission Expansion Planning Assessment Methodsmentioning
confidence: 99%
See 4 more Smart Citations
“…The workflow of the assessment is shown in Figure 4. The data needed to assess the power system planning include the existing transmission system, the load forecasting result, the additional generating unit, and the proposed transmission line candidates, which are provided by the previous study [4,8]. After all of the data are collected, the power system is then modeled for a particular year in the commercial power system simulation package DIgSILENT PowerFactory [33], the user interface of which is presented in Figure 5.…”
Section: Transmission Expansion Planning Assessment Methodsmentioning
confidence: 99%
“…The proposed Maluku power system plan was obtained from our previous work on the design of the Eastern Indonesia Masterplan, as presented in [4], and the generation and expansion planning of the Ambon-SHS system, including the decision to use interconnection, as presented in [8]. These papers show that the most economical plan will be achieved if the Ambon-SHS are connected through a submarine interconnection system in 2025.…”
Section: Rotor Angle Stabilitymentioning
confidence: 99%
See 3 more Smart Citations