2000
DOI: 10.1007/s11837-000-0173-2
|View full text |Cite
|
Sign up to set email alerts
|

The life-cycle impacts of aluminum body-in-white automotive material

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
56
0
1

Year Published

2002
2002
2021
2021

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 84 publications
(57 citation statements)
references
References 4 publications
0
56
0
1
Order By: Relevance
“…Like a previous assessment (Das et al 2000), this assessment shows that the total waste stream of each of the 3XVs is greater than that of the baseline vehicle. Total waste increases range from 60% to 82%.…”
Section: Eandmp Wastes From 3xvsmentioning
confidence: 52%
See 3 more Smart Citations
“…Like a previous assessment (Das et al 2000), this assessment shows that the total waste stream of each of the 3XVs is greater than that of the baseline vehicle. Total waste increases range from 60% to 82%.…”
Section: Eandmp Wastes From 3xvsmentioning
confidence: 52%
“…This study estimates the total waste stream and categorizes it by type of waste. It builds upon previous lifecycle analysis work (Das et al 2000) that showed that more than 75% of the 3XVs' lifetime solid waste generation occurred in the E&MP stage. This previous work did not characterize the waste stream by type of solid waste.…”
Section: Assessment Of the Eandmp Waste Streammentioning
confidence: 91%
See 2 more Smart Citations
“…The forecast period under consideration will affect the estimated benefits, and it is particularly important in the case of two aluminum-related projects as more use phase benefits are realized later in the forecast period with a greater number of lightweight vehicles in the vehicle fleet. A recent study indicates that aluminum-intensive vehicles containing aluminum sheets takes more than 15 years to achieve life-cycle equivalence emissions at the fleet level with conventional steel vehicles (Das, 2000). Table 4.12 contains social benefit-cost ratios for the projects.…”
Section: Market Penetration Benefit Estimatesmentioning
confidence: 99%