The International Linear Collider Technical Design Report - Volume 3.II: Accelerator Baseline Design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
119
0

Year Published

2014
2014
2022
2022

Publication Types

Select...
5
3

Relationship

1
7

Authors

Journals

citations
Cited by 74 publications
(119 citation statements)
references
References 0 publications
0
119
0
Order By: Relevance
“…After the completion of the ILC TDR [9] in 2013, the GDE was replaced by the LCC. In spite of limited direct funding for ILC studies in Europe during the last five years, the combined efforts in several related projects have allowed European researchers to continue ILC project development activities in the framework of the LCC, in close collaboration with Japan.…”
Section: A Ilc Accelerator Competence In Europementioning
confidence: 99%
See 1 more Smart Citation
“…After the completion of the ILC TDR [9] in 2013, the GDE was replaced by the LCC. In spite of limited direct funding for ILC studies in Europe during the last five years, the combined efforts in several related projects have allowed European researchers to continue ILC project development activities in the framework of the LCC, in close collaboration with Japan.…”
Section: A Ilc Accelerator Competence In Europementioning
confidence: 99%
“…Figure 2 shows the primary cost drivers of the ILC as identified in the ILC TDR [9]. The dominant cost driver is the production of approximately 930 SCRF cryomodules.…”
Section: B Ilc Accelerator Preparation Phase Activities In Europementioning
confidence: 99%
“…In the design of International Linear Collider (ILC) [1], distance between the interaction point and the front surface of the final focusing quadrupole magnet, L * , is one of the essential parameters of the accelerator. In the baseline design, L * is 4.1 m [2].…”
Section: Introductionmentioning
confidence: 99%
“…• difficulty in opening detector endcap. After publication of the ILC TDR [1], longer L * optics has been proposed [4,5,6] and seriously studied for CLIC. In the recent CLIC design L * = 6 m is adopted.…”
Section: Introductionmentioning
confidence: 99%
“…Concerning the location of the utility/service cavern, there have been several designs so far [1,2,3,4]. The design in TDR [1] is obsolete now because the baseline design of the detector hall (DH) and the tunnels around DH has been largely modified from TDR.…”
Section: Introductionmentioning
confidence: 99%