2019
DOI: 10.5194/isprs-archives-xlii-2-w11-141-2019
|View full text |Cite
|
Sign up to set email alerts
|

The Integration of a Scan-to-Hbim Process in Bim Application: The Development of an Add-in to Guide Users in Autodesk Revit

Abstract: <p><strong>Abstract.</strong> In recent years, the generative process of building information modeling (BIM) digital models oriented to the digitisation of heritage buildings has been supported by the development of new modeling tools, able to integrate the point cloud data produced by laser scanning and digital photogrammetry in major modeling software applications such as Autodesk Revit and Graphisoft Archicad. Architectural and structural elements of churches, castles, and historical monum… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
17
0
3

Year Published

2019
2019
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 26 publications
(20 citation statements)
references
References 6 publications
0
17
0
3
Order By: Relevance
“…The workflow here presented, named also scan-to-BIM process, needs different levels of accuracy and generation, especially because, actually, there are no three-dimensional objects corresponding to historical elements inside predefined libraries and families. In this sense every BIM project, Grade of Generation (GOG) should be referred to the quality of creation and the modelling requirements, while the Grade of Accuracy (GOA) should set out the standard deviation between reality-based point clouds and model, in this case NURBS model (Banfi F., 2017(Banfi F., , 2019. In other words, GOG defines the techniques of modelling and then how the model has been generated.…”
Section: Model Generation and Accuracymentioning
confidence: 99%
See 1 more Smart Citation
“…The workflow here presented, named also scan-to-BIM process, needs different levels of accuracy and generation, especially because, actually, there are no three-dimensional objects corresponding to historical elements inside predefined libraries and families. In this sense every BIM project, Grade of Generation (GOG) should be referred to the quality of creation and the modelling requirements, while the Grade of Accuracy (GOA) should set out the standard deviation between reality-based point clouds and model, in this case NURBS model (Banfi F., 2017(Banfi F., , 2019. In other words, GOG defines the techniques of modelling and then how the model has been generated.…”
Section: Model Generation and Accuracymentioning
confidence: 99%
“…As said before, this aspect is fundamental in order to adapt the modelling action to the real object and not the opposite. Indeed, a NURBS model created interpolating point clouds is classified as GOG 10 (maximum level), while a model generated by extracting geometric primitives from slices is referred to GOG 9 (Banfi F., 2019). This is the case of the rib vault, generated by extracting slices from planar sections, creating a spar profile and modelling directly on it by using sweep, loft, patch functions (GOG 9).…”
Section: Model Generation and Accuracymentioning
confidence: 99%
“…Time-consuming scan-to-BIM process needs to be optimized, so necessary add-inns for the most used BIM software such as Revit are currently developed [19].…”
Section: Scan-to-bim Technologymentioning
confidence: 99%
“…The second study considered is 'The integration of a Scan-to-HBIM process in BIM application: the development of an addin to guide users in Autodesk Revit' (Banfi, 2019). This research shows how it was possible to develop and improve Revit functions and modelling tools thanks to an accurate study of the application programming interface (API).…”
Section: Related Work and Research Objectivesmentioning
confidence: 99%