2008
DOI: 10.1016/j.nucengdes.2007.03.001
|View full text |Cite
|
Sign up to set email alerts
|

The individual channel monitoring (ICM) proposal to improve the safety performance of RBMK

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2008
2008
2017
2017

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 11 publications
0
2
0
Order By: Relevance
“…The performed thermalhydraulic analyses demonstrate that scram can be actuated early enough to prevent the PT rupture. See also [2][3][4][5][6][7].…”
Section: The Icm Proposalmentioning
confidence: 99%
“…The performed thermalhydraulic analyses demonstrate that scram can be actuated early enough to prevent the PT rupture. See also [2][3][4][5][6][7].…”
Section: The Icm Proposalmentioning
confidence: 99%
“…The overpassing of this threshold should cause the PT rupture, pressure increase into the reactor cavity and scram generation signal. Hydraulic blockage (i.e., loss of cooling) of one core channel is discussed in [9]. Investigations allowed the evaluation of the consequences of this event that unavoidably causes the rupture of the pressure tube and the radioactivity release to the NPP confinement system (reactor cavity and accident localization system) and to the environment.…”
Section: Introductionmentioning
confidence: 99%