The Impact of Failure Types in Construction Production Systems on Economic Risk Assessments in the Bidding Phase

Abstract: The aim of the paper is to research and analyze the impact of the type of failure on economic risks in the bidding phase, as the most important part in the management of construction projects. The survey included the impact of risk on the process of determining unit prices from the perspective of a potential contractor. Also, the failure rate and repair rate of the 34 machines from the machine park of the company for road construction were researched. On the basis of obtained parameters and depreciation period… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
9
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
5

Relationship

2
3

Authors

Journals

citations
Cited by 5 publications
(9 citation statements)
references
References 31 publications
0
9
0
Order By: Relevance
“…This feature of the components and systems leads to the modification of the frequency balancing method so as to increase the accuracy of component availability estimates. The results obtained did not differ significantly from the application of the frequency balancing method and the Monte Carlo simulation method [1], [2]. Specifically, when there are data on availability from the previous work (operational availability), then the availability estimates for periods I, II and III can be made on the basis of Eq.…”
Section: Assessment Of Equipment Availabilitymentioning
confidence: 95%
See 4 more Smart Citations
“…This feature of the components and systems leads to the modification of the frequency balancing method so as to increase the accuracy of component availability estimates. The results obtained did not differ significantly from the application of the frequency balancing method and the Monte Carlo simulation method [1], [2]. Specifically, when there are data on availability from the previous work (operational availability), then the availability estimates for periods I, II and III can be made on the basis of Eq.…”
Section: Assessment Of Equipment Availabilitymentioning
confidence: 95%
“…Specifically, when there are data on availability from the previous work (operational availability), then the availability estimates for periods I, II and III can be made on the basis of Eq. 28, 29 and 30 [1], [2].…”
Section: Assessment Of Equipment Availabilitymentioning