The German demo inside GRID4EU: field experience, lessons learnt and some aspects about cost-benefit of innovative solutions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2017
2017

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Engineers from Dutch DSO Alliander considered losses from their medium-voltage (MV) grid and concluded that smart re-configuration of normally open points could achieve loss reduction worth €15M [6]. A multi-module system developed by ABB also listed reduced losses as a benefit of their improved control system [7]. Similarly, a Portuguese network operator, in a study on load flexibility, included reduced losses in their analysis [8].…”
Section: Energy Lossesmentioning
confidence: 99%
“…Engineers from Dutch DSO Alliander considered losses from their medium-voltage (MV) grid and concluded that smart re-configuration of normally open points could achieve loss reduction worth €15M [6]. A multi-module system developed by ABB also listed reduced losses as a benefit of their improved control system [7]. Similarly, a Portuguese network operator, in a study on load flexibility, included reduced losses in their analysis [8].…”
Section: Energy Lossesmentioning
confidence: 99%