Proceedings of the 10th Int. Particle Accelerator Conf. 2019
DOI: 10.18429/jacow-ipac2019-mopts014
|View full text |Cite
|
Sign up to set email alerts
|

The Experimental Area at the ARES LINAC

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…The present status of ARES is shortly summarized. Its 5 MeV RF gun and linac has been commissioned [18] and first electrons have been produced at the end of 2019 [19]. The installation of the subsequent experimental chamber and diagnostic beam line is finished [19].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The present status of ARES is shortly summarized. Its 5 MeV RF gun and linac has been commissioned [18] and first electrons have been produced at the end of 2019 [19]. The installation of the subsequent experimental chamber and diagnostic beam line is finished [19].…”
Section: Introductionmentioning
confidence: 99%
“…Its 5 MeV RF gun and linac has been commissioned [18] and first electrons have been produced at the end of 2019 [19]. The installation of the subsequent experimental chamber and diagnostic beam line is finished [19]. The preparations for a DLA experiment are ongoing and simulation studies have been performed for a potential LPA experiment [20].…”
Section: Introductionmentioning
confidence: 99%