2004
DOI: 10.1109/tpwrs.2004.836262
|View full text |Cite
|
Sign up to set email alerts
|

The Coordinated Automatic Voltage Control of the Italian Transmission Grid—Part II: Control Apparatuses and Field Performance of the Consolidated Hierarchical System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
33
0
4

Year Published

2014
2014
2021
2021

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 114 publications
(39 citation statements)
references
References 4 publications
0
33
0
4
Order By: Relevance
“…Zbog toga automatizacija upravljanja naponsko-reaktivnim prilikama u sistemu postaje sve značajnija. Hijerarhijska automatska kontrola napona realizovana je u nekoliko zemalja [1], [2], [3]. Najveći nedostatak realizovanih sistema je zatvorena povratna petlja po reaktivnoj snazi [2], [3].…”
Section: Uvodunclassified
See 2 more Smart Citations
“…Zbog toga automatizacija upravljanja naponsko-reaktivnim prilikama u sistemu postaje sve značajnija. Hijerarhijska automatska kontrola napona realizovana je u nekoliko zemalja [1], [2], [3]. Najveći nedostatak realizovanih sistema je zatvorena povratna petlja po reaktivnoj snazi [2], [3].…”
Section: Uvodunclassified
“…Hijerarhijska automatska kontrola napona realizovana je u nekoliko zemalja [1], [2], [3]. Najveći nedostatak realizovanih sistema je zatvorena povratna petlja po reaktivnoj snazi [2], [3]. Zato se u veoma složenom francuskom EES uvodi regulacija pilot čvora koja obuhvata sve generatore u zoni i koordiniše njihovo dejstvo [1].…”
Section: Uvodunclassified
See 1 more Smart Citation
“…This system controls the terminal voltage of the generator by Automatic Voltage Regulator (AVR) in the generation level, whereas controls the key bus voltage by control generators in a control regional level. The concept of the key bus and the control area are based on interrelation between a load bus and another load buses by electrical distance [4][5][6][7][8][9]. The on-line voltage control using full SCADA information is implemented in the bulk power system.…”
Section: Introductionmentioning
confidence: 99%
“…Under current situation, the system operator of Korea has been interested in hierarchical voltage control, which was initially proposed in several European countries. They have firstly proposed a secondary voltage control which can control the voltages of generators through controlling reactive powers to maintain the pilot bus voltage in a voltage control area [1][2][3][4][5][6][7][8][9]. The desired voltages on the pilot buses come from the results of optimal voltage-var planning in the energy management system of independent system operators.…”
Section: Introductionmentioning
confidence: 99%