2008
DOI: 10.1080/01446190802043918
|View full text |Cite
|
Sign up to set email alerts
|

The compilation methods of building price indices in Britain: a critical review

Abstract: The major message that I will be trying to convey is that we often misinterpret the available data because of inadequate attention to how they are produced … (Griliches, 1994, p. 2) The importance of accurate measurement and pertinent modelling of the general level of construction prices cannot be overemphasized. Uses range from macroeconomic statistics such as real value of investment to micro-level budgeting like construction project price forecasts. Numerous research studies posit that the measured producti… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0

Year Published

2010
2010
2021
2021

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 12 publications
(10 citation statements)
references
References 25 publications
0
10
0
Order By: Relevance
“…Second, in collaboration with Andrew Edkins, Kai Rintala (PhD awarded in 2004) and Alex Murray, Graham maintained momentum on public-private partnership research (Rintala et al, 2008). Third, Graham worked with his PhD student, Marco Yu, on construction statistics (Yu and Ive, 2008;Ive and Yu, 2011). Fourth, Graham published two government-commissioned reports, on construction productivity (Ive et al, 2004) and on trade credit (Ive and Murray, 2013).…”
Section: From 2001 To Present: School Of Construction and Project Manmentioning
confidence: 99%
“…Second, in collaboration with Andrew Edkins, Kai Rintala (PhD awarded in 2004) and Alex Murray, Graham maintained momentum on public-private partnership research (Rintala et al, 2008). Third, Graham worked with his PhD student, Marco Yu, on construction statistics (Yu and Ive, 2008;Ive and Yu, 2011). Fourth, Graham published two government-commissioned reports, on construction productivity (Ive et al, 2004) and on trade credit (Ive and Murray, 2013).…”
Section: From 2001 To Present: School Of Construction and Project Manmentioning
confidence: 99%
“…Around 100 different items were priced for five building types and each of five types had its own index. A recent analysis of British building price indices by Yu and Ive (2008) found that these indices measure the price movement of the traditional building trades but almost completely ignore mechanical and electrical services. Cannon (1994) questioned the accuracy of contractor statistics and Briscoe (2006) asked: "How useful and reliable are construction statistics?"…”
Section: The Accuracy and Impact Of Price Indicesmentioning
confidence: 99%
“…An example of this is the published prices by JBC listing.Factor indices for measuring the cost of resources to a contractor. These are useful for contracts where there are fluctuations in prices.Laspeyres index which is applied where an index uses the base year weightings for each calculation (Yu and Ive, 2008). Paasche index which is applied where index uses weightings obtained from the current year or point in time that is under consideration (Yu and Ive, 2008).…”
Section: An Overview Of Factor Cost Indicesmentioning
confidence: 99%
“…These are useful for contracts where there are fluctuations in prices.Laspeyres index which is applied where an index uses the base year weightings for each calculation (Yu and Ive, 2008). Paasche index which is applied where index uses weightings obtained from the current year or point in time that is under consideration (Yu and Ive, 2008). Divisia index which takes into account prices and quantities in a multi‐period trend analysis (Balk, 2005).…”
Section: An Overview Of Factor Cost Indicesmentioning
confidence: 99%
See 1 more Smart Citation