The City of San Jose Biomass Waste to Energy Evaluation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2010
2010
2010
2010

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The plan is to issue requests for proposals for ten 2 MW generators, with a net 19 MW power production, which will enable San Jose to produce electricity beyond the current requirements of the plant. (Surti and Tucker 2008). In its master planning, energy production from conventional biogas-fueled generators and the new syngas generators will exceed 3,000 kWh/MG.…”
Section: Figure 5: Energy Savings Potential From New Technologies (Tamentioning
confidence: 99%
“…The plan is to issue requests for proposals for ten 2 MW generators, with a net 19 MW power production, which will enable San Jose to produce electricity beyond the current requirements of the plant. (Surti and Tucker 2008). In its master planning, energy production from conventional biogas-fueled generators and the new syngas generators will exceed 3,000 kWh/MG.…”
Section: Figure 5: Energy Savings Potential From New Technologies (Tamentioning
confidence: 99%