The challenge of building the Buda-Pesth Chain Bridge across the icebound Danube

Abstract: The freezing of the Danube over the winter months was a critical influence in the provision and method of construction of what is now the Széchenyi Chain Bridge in Budapest, Hungary, between 1839 and 1849. The bridge of boats connection between the former towns of Buda and Pesth could not operate in the winter months and it was imperative that a permanent structure be built. The major considerations in building the bridge related to the dangers posed by the river freezing over: in particular, choosing a chain … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
7
0

Year Published

2013
2013
2015
2015

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(7 citation statements)
references
References 5 publications
0
7
0
Order By: Relevance
“…In March 1838 a devastating flood caused by ice blocking destroyed a large part of Pesth claiming 151 lives and adding urgency to the building of a permanent bridge (Vaci and Vignoles, 2013). In September 1838 the bridge committee signed off the eventual position of the chain bridge and a year later the crown in Vienna agreed (see Figure 4).…”
Section: The Realisation and Historical Circumstancesmentioning
confidence: 99%
See 3 more Smart Citations
“…In March 1838 a devastating flood caused by ice blocking destroyed a large part of Pesth claiming 151 lives and adding urgency to the building of a permanent bridge (Vaci and Vignoles, 2013). In September 1838 the bridge committee signed off the eventual position of the chain bridge and a year later the crown in Vienna agreed (see Figure 4).…”
Section: The Realisation and Historical Circumstancesmentioning
confidence: 99%
“…On their return to London they wrote a letter to Tierney Clark reporting in detail about the thickness and movement of the ice sheet during their stay (MOL, N 67/2/85-90). It had been recognised from the start that the major challenge was the icebound nature of the Danube (Vaci and Vignoles, 2013).…”
Section: Structural Designmentioning
confidence: 99%
See 2 more Smart Citations
“…That is no doubt reflected in his joining with Sandor Vaci to write about the Chain Bridge between Buda and Pesth (Vaci and Vignoles, 2013). The history of flooding and ice that preceded its construction provides a useful background and perhaps explains why engineers would be brought so far to build a bridge of relatively modern construction.…”
mentioning
confidence: 99%