“…BWEs operate in very harsh conditions, being exposed to extreme dynamic and stochastic loads. Improvements have been made in the estimation of working loads (Czmochowski, 2008;Bošnjak et al, 2009b;Gottvald and Kala, 2012), calculation methods (Bošnjak et al, 2006;Gottvald, 2010;Rusiński et al, 2010b;, production technologies and monitoring of vital subsystems (Bartelmus, 2006;Rişteiu et al, 2006;Yin et al, 2007;2008;Bartelmus and Zimorz, 2009). However, failures of structural elements (Bošnjak et al, 2009a;Rusiński et al, 2010a; and mechanisms (Dudek et al, 2011;Savković et al, 2011) are almost inevitable during BWE operation.…”