The Analysis of Job Stress of Workers in the Architectural Design Firm After the Introduction of BIM

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2013
2013
2020
2020

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 5 publications
0
2
0
1
Order By: Relevance
“…BIM can improve business efficiency by embodying real buildings in virtual space. In the initial phase of BIM introduction, both the 2D and 3D processes coexist, resulting in practitioners performing the duplicate work of creating both a BIM model and 2D drawings [8]. Although the practitioners are burdened by the additional work, existing methods for generating 2D drawings from BIM models are incapable of producing detailed technical drawings.…”
Section: Discussionmentioning
confidence: 99%
“…BIM can improve business efficiency by embodying real buildings in virtual space. In the initial phase of BIM introduction, both the 2D and 3D processes coexist, resulting in practitioners performing the duplicate work of creating both a BIM model and 2D drawings [8]. Although the practitioners are burdened by the additional work, existing methods for generating 2D drawings from BIM models are incapable of producing detailed technical drawings.…”
Section: Discussionmentioning
confidence: 99%
“…For example, it is possible to directly check the height and dimensions indicated in the license drawings from the BIM information. It is also possible to automatically check the items to be checked in the elevation, section, and floor plan of each drawing by using review software, such as Solibri Model Checker, KBim Assess, and SBim Assess [21]. In particular, it provides quantitative evaluation results for items required by licensing regulations, such as the size of buildings, the distance and height between various objects, parking lanes, and evacuation lanes [22].…”
Section: Reflection Of Bim Design Book Optimization Criteriamentioning
confidence: 99%
“…건설근로자 직무스트레스와 관련된 선행연구를 살펴보 면, 종사자의 직무 스트레스 유발원인들에 대한 영향정도를 분석한 연구 [1], 관리자 직무스트레스와 프로젝트 관리의 관계를 분석한 연구 [2], 근로자들의 직무스트레스 해소프로 그램을 제시한 연구 [3], 직무스트레스와 우울의 관계를 분 석한 연구 [4], BIM 도입 후 설계사무소 실무자들의 직무스 트레스를 분석한 연구 [5], 종사자의 작업능력과 직무스트레 스가 재해발생에 미치는 영향정도를 분석한 연구 [6], 내· 외국인 근로자들의 직무스트레스 영향요인과 재해의 관계 를 분석한 연구 [7], 견적 실무자들의 직무스트레스 영향요 인을 분석한 연구 [8] There is a lack of promotion of activities 35 20 33 11 99…”
Section: 선행연구 고찰unclassified