“…linac MEA [1]. Meanwhile the pulse stretcher ring AmPS was designed [2] with the aim to improve the duty factor with almost 2 orders of magnitude. Installation of the AmPS facility started early 1991 and the first extracted beam on target was available by mid 1992.…”