2011
DOI: 10.1088/1742-6596/301/1/012047
|View full text |Cite
|
Sign up to set email alerts
|

Testing the electrostatic characteristics of polypropylene fabric with metallic yarns, intended for use in coal mines threatened by the explosion hazard. Part 1: Laboratory tests

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
3
0

Year Published

2011
2011
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 3 publications
0
3
0
Order By: Relevance
“…Several technical solutions have been created for electricity generators, which use belt conveyor movement to convert mechanical energy into electricity, however, in each of the known solutions the possibility of using this energy is only possible during the conveyor operation. In 4) -the bearing housing, (5) -labyrinth seal (5), rings (6) -snap (7) -sealing, (8) -closing, [33] known design solutions, the use of the generator requires a change in the form of the conveyor belt, which in the case of an existing conveyor requires a new approval. In addition, in the case of the main belt conveyor, located in underground workings, the assembly [37] of additional generator holders on the conveyor's trestles can be complicated and time-consuming, and thus expensive, due to the stopped production process in the mine.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…Several technical solutions have been created for electricity generators, which use belt conveyor movement to convert mechanical energy into electricity, however, in each of the known solutions the possibility of using this energy is only possible during the conveyor operation. In 4) -the bearing housing, (5) -labyrinth seal (5), rings (6) -snap (7) -sealing, (8) -closing, [33] known design solutions, the use of the generator requires a change in the form of the conveyor belt, which in the case of an existing conveyor requires a new approval. In addition, in the case of the main belt conveyor, located in underground workings, the assembly [37] of additional generator holders on the conveyor's trestles can be complicated and time-consuming, and thus expensive, due to the stopped production process in the mine.…”
Section: Introductionmentioning
confidence: 99%
“…1. The roller design: (1) -the shell, (2) -the axis, (3) -the hub, (4) -the bearing housing, (5) -labyrinth seal (5), rings (6) -snap (7) -sealing, (8) -closing,[33]…”
mentioning
confidence: 99%
See 1 more Smart Citation