2019 IEEE Industry Applications Society Annual Meeting 2019
DOI: 10.1109/ias.2019.8912362
|View full text |Cite
|
Sign up to set email alerts
|

Testing and Modeling of DC Arc Flash in 125V Substation Battery Backup Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 14 publications
0
1
0
Order By: Relevance
“…found the NFPA 70E/maximum power method was about 3 to 10 times higher than their measured results. Additionally, DC arc flash testing was conducted by AEP utilizing 125 V flooded lead-acid batteries for the arc testing power supply which also found the maximum power method for arcs in an enclosure to be conservative [6], [7].…”
mentioning
confidence: 99%
“…found the NFPA 70E/maximum power method was about 3 to 10 times higher than their measured results. Additionally, DC arc flash testing was conducted by AEP utilizing 125 V flooded lead-acid batteries for the arc testing power supply which also found the maximum power method for arcs in an enclosure to be conservative [6], [7].…”
mentioning
confidence: 99%