Abstract:In the shield project, crossing through the permeable, collapsing and unstable pebble layers has been the critical and difficult point of construction. Oujiang shield tunnel was 834.5 m long, it was mainly crossing through the formation of medium sand bed, pebble bed and andesitic porphyrite. Among them, the pebble bed was more than 300 meters long, the largest pebble grain size was 450 mm, 60% of pebble grain size was more than 150 mm, its proportion was more than 90%. For the tool pan break ribs large grain … Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.