2020
DOI: 10.5370/kiee.2020.69.9.1338
|View full text |Cite
|
Sign up to set email alerts
|

Techno-Economic Evaluation Software for Optimal Business Model and Sizing of Photovoltaic Power Station-Linked Energy Storage System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…However, in the context of the thriving development of the photovoltaic power generation industry, there are many problems, especially, the operation and maintenance management of photovoltaic power plants under the jurisdiction of power generation groups. The operation and maintenance management level or means of most photovoltaic power generation groups are far from matching their power plants [2]. The speed of construction, coupled with the scattered geographical location of photovoltaic power stations, large power station area, and relative scarcity of professionals and other characteristics and status quo, has led to the insufficient production and management capabilities of photovoltaic power plants in photovoltaic power generation enterprise groups and the low power generation efficiency of photovoltaic power plants; corporate profits cannot be reliably guaranteed.…”
Section: Introductionmentioning
confidence: 99%
“…However, in the context of the thriving development of the photovoltaic power generation industry, there are many problems, especially, the operation and maintenance management of photovoltaic power plants under the jurisdiction of power generation groups. The operation and maintenance management level or means of most photovoltaic power generation groups are far from matching their power plants [2]. The speed of construction, coupled with the scattered geographical location of photovoltaic power stations, large power station area, and relative scarcity of professionals and other characteristics and status quo, has led to the insufficient production and management capabilities of photovoltaic power plants in photovoltaic power generation enterprise groups and the low power generation efficiency of photovoltaic power plants; corporate profits cannot be reliably guaranteed.…”
Section: Introductionmentioning
confidence: 99%