Techno-Economic Analysis and Optimisation of Campus Grid-Connected Hybrid Renewable Energy System Using HOMER Grid

Abstract: This study aimed to conduct a techno-economic performance and optimisation analysis of grid-connected PV, wind turbines, and battery packs for Syiah Kuala University, situated at the tip of Sumatra island in the tsunami-affected region. The simulation software Hybrid Optimisation Model for Electric Renewables (HOMER) was used to analyse and optimise the renewable energy required by the institution. The methodology began with the location specification, average electric load demand, daily radiation, clearness i… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
32
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 52 publications
(32 citation statements)
references
References 16 publications
0
32
0
Order By: Relevance
“…It is capable of simulating the whole annual operation of any hybrid micro-grid in various breakdowns ranging from one minute to sixty minutes [46]. The HOMER solution has been used in many scientific works to research energy problems, including [43,44,[46][47][48][49][50][51], and it is proven to be able to estimate real energy situations with high accuracy [51]. These circumstances also justified the use of HOMER Pro in the current study.…”
Section: Introducing the Modeling Platformmentioning
confidence: 69%
“…It is capable of simulating the whole annual operation of any hybrid micro-grid in various breakdowns ranging from one minute to sixty minutes [46]. The HOMER solution has been used in many scientific works to research energy problems, including [43,44,[46][47][48][49][50][51], and it is proven to be able to estimate real energy situations with high accuracy [51]. These circumstances also justified the use of HOMER Pro in the current study.…”
Section: Introducing the Modeling Platformmentioning
confidence: 69%
“…The duration required to recoup the investment made in the installation of a plant is termed as the PB 66 . The payback is an indication of how long it would take to repay the difference in investment costs between the optimized and basic case systems 67,68 as presented in the below equation. PBP0.25em=Initial1eminvestmentCash1emfow1emper1emperiod. $\text{PBP}\,=\frac{\mathrm{Initial}\,\mathrm{investment}}{\mathrm{Cash}\,\mathrm{fow}\,\mathrm{per}\,\mathrm{period}}.$…”
Section: Methodsmentioning
confidence: 99%
“…The duration required to recoup the investment made in the installation of a plant is termed as the PB. 66 The payback is an indication of how long it would take to repay the difference in investment costs between the optimized and basic case systems 67,68 as presented in the below equation.…”
Section: Pbmentioning
confidence: 99%
“…In addition to exploiting hydropower capacity and creating water sources for irrigating agricultural lands, with the large surface areas, these can also be used to install other floating PV plants. Regarding various renewable and sustainable energy technologies [21][22][23][24][25][26][27][28], the Hybrid renewable system [10][11][12]16,17,19,29,30], Hybrid PV system [13][14][15]20,[31][32][33], Energy conservation of smart grid system [34], the floating PV plant can utilize the large water surface areas of hydropower reservoirs to add more capacity to the national utility grid, and has been promoted by many researchers and agreed upon by the Vietnamese government.…”
Section: Misurata Libyamentioning
confidence: 99%