Technical Innovations of the Aizhai Bridge in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 12 publications
(4 citation statements)
references
References 1 publication
0
4
0
Order By: Relevance
“…RB-TI in CMDAs is the deepening and extension of existing bridge engineering design and construction technologies, as well as the development of new technologies that may emerge in the future. According to the literature review, there are abundant achievements in RB-TI, which mainly focus on structural design [ 7 , 8 ], construction technology [ 9 , 10 ], maintenance [ 11 , 12 ], and intelligent construction [ 13 , 14 ], etc. However, few researchers have studied the management of TI in bridge projects during railway construction, and this has led to the low efficiency of TI.…”
Section: Introductionmentioning
confidence: 99%
“…RB-TI in CMDAs is the deepening and extension of existing bridge engineering design and construction technologies, as well as the development of new technologies that may emerge in the future. According to the literature review, there are abundant achievements in RB-TI, which mainly focus on structural design [ 7 , 8 ], construction technology [ 9 , 10 ], maintenance [ 11 , 12 ], and intelligent construction [ 13 , 14 ], etc. However, few researchers have studied the management of TI in bridge projects during railway construction, and this has led to the low efficiency of TI.…”
Section: Introductionmentioning
confidence: 99%
“…In addition, a suspension bridge is proposed to adapt to the terrain, which fully uses the terrain to integrate with nature and improve the economy. The Aizhai Bridge (Hu and Shen 2014) is a pylon-girder detached suspension bridge used to connect with mountain tunnels on both sides of the bridge by shortening the stiffening girder. The Hutiaoxia Jinsha River Bridge (Yu et al, 2022) is a single-tower earth-anchored suspension bridge (STEASB) using a composite saddle to reduce the number of bridge towers and side spans.…”
Section: Introductionmentioning
confidence: 99%
“…Mature construction methods include the deck crane construction method [16], and the cable crane construction method, among others [8,9]. Rail cable shifting (RCS) is a new, recently invented method, and it was firstly used in the successful erection of the girder of the Aizhai Bridge [17][18][19][20][21][22][23]. The erection of the 1000.5-m steel truss girder required only two and a half months [16].…”
Section: Introductionmentioning