2019
DOI: 10.1002/geot.201900033
|View full text |Cite
|
Sign up to set email alerts
|

Technical and logistical challenges of the construction of the Museumsinsel Station in Berlin

Abstract: The closing of the gap in line U5 of the Berlin underground completes the missing connection between the Alexanderplatz and Brandenburger Tor stations. The existing line U5 currently ends at the Alexanderplatz. With the closure of the gap, the existing tunnels at the Berliner Roten Rathaus will be connected to the Brandenburger Tor station on the line U55. The project includes the construction of three new underground stations and two single‐track tunnels connecting them, which are being tunnelling by shield m… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles