2021
DOI: 10.1016/j.apenergy.2021.116893
|View full text |Cite
|
Sign up to set email alerts
|

Technical and economic performance assessment of post-combustion carbon capture using piperazine for large scale natural gas combined cycle power plants through process simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 46 publications
(7 citation statements)
references
References 73 publications
0
7
0
Order By: Relevance
“…Regarding the regenerator, the models consider rate-based models and chemical equilibrium, as this approach is generally accepted. 56 3.2. MEA Model.…”
Section: Process Modelingmentioning
confidence: 99%
See 1 more Smart Citation
“…Regarding the regenerator, the models consider rate-based models and chemical equilibrium, as this approach is generally accepted. 56 3.2. MEA Model.…”
Section: Process Modelingmentioning
confidence: 99%
“…In the present work, we consider a rigorous approach to model the absorption column, which includes rate-based models and kinetic reactions. Regarding the regenerator, the models consider rate-based models and chemical equilibrium, as this approach is generally accepted …”
Section: Process Modelingmentioning
confidence: 99%
“…Capital costs, annual operating and maintenance costs, and the overall level of annual costs of the complete power plant and CCP were economically analyzed. In this study, cost evaluation and economic analysis were performed based on NETL and Aspen Economic Analyzer v8.8. , Following similar methods with references, the assessment assumptions and calculation procedures for cost evaluation and economic analysis in the study are summarized in Table . The method was validated in the previous work …”
Section: Problem Formulationmentioning
confidence: 99%
“…8. Otitoju et al [58] has published the indices used for the CAPEX approach. The CAPEX of the large-scale PCC plant of case 1 and case 2 are provided in Table 14.…”
Section: Economic Analysismentioning
confidence: 99%