Target Value Delivery in Bid Process

Abstract: The use of the traditional tendering procedure is predominant in the construction industry; although it is ill-equipped for the current complex and dynamic nature of the industry. Various Lean construction scholars have noted that while construction clients are demanding for more complex and dynamic projects, there is a need to transform the traditional tendering procedure which focuses on the lowest cost for the selection of contractors, while neglecting their technical and management qualifications to one th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 6 publications
(6 reference statements)
0
1
0
Order By: Relevance
“…The last two effects usually make the project prone to suffering schedule delays and cost overruns project (Wondimu et al, 2018). Multiple studies suggest that collaborative approaches such Target Value Design (TVD) and Integrated Project Delivery (IPD), as alternative to the traditional tendering methods, can be integrated into the procurement phase to meet the needs of the project (Mosey, 2019;Musa & Pasquire, 2020;Whelton et al, 2004).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The last two effects usually make the project prone to suffering schedule delays and cost overruns project (Wondimu et al, 2018). Multiple studies suggest that collaborative approaches such Target Value Design (TVD) and Integrated Project Delivery (IPD), as alternative to the traditional tendering methods, can be integrated into the procurement phase to meet the needs of the project (Mosey, 2019;Musa & Pasquire, 2020;Whelton et al, 2004).…”
Section: Literature Reviewmentioning
confidence: 99%
“…A tool is a structured technique or instrument that facilitates the implementation of principles, while a management practice refers to concrete actions associated with increasing productivity [62][63][64]. Table 1 includes the first documented project practices that are used and recommended [47,48]; the fundamental practices listed by [27]; and updated, added, and recommended practices and tools that were associated with the TVD, lean design, and lean management by other authors [4,5,9,11,[15][16][17]55,60,61,[65][66][67][68][69][70][71][72][73][74][75][76][77][78][79][80].…”
Section: Tvd Practices and Toolsmentioning