1993
DOI: 10.2172/10103939
|View full text |Cite
|
Sign up to set email alerts
|

Tank characterization report: Tank 241-C-109

Abstract: Matrix Splke Oupll¢ite BOX insufficient BOXSample Simple BOX Dupllcalo Avallible MethodsBlink

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
37
0

Year Published

1993
1993
2018
2018

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 19 publications
(39 citation statements)
references
References 5 publications
2
37
0
Order By: Relevance
“…Low gas generation rates (Fowler and Graves 1994) and the low potential for exothermkferrocyanide reactions (Postma et al 1994a) indicated that continuous pressure monitoring is not warranted. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Simpson et al (1993aSimpson et al ( , 1993b. 46 R. H. is the percent relative humidity calculated from measured dome space water content (mgk), temperature and atmospheric pressure.…”
Section: Pressure Monitoringmentioning
confidence: 99%
“…Low gas generation rates (Fowler and Graves 1994) and the low potential for exothermkferrocyanide reactions (Postma et al 1994a) indicated that continuous pressure monitoring is not warranted. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Simpson et al (1993aSimpson et al ( , 1993b. 46 R. H. is the percent relative humidity calculated from measured dome space water content (mgk), temperature and atmospheric pressure.…”
Section: Pressure Monitoringmentioning
confidence: 99%
“…Assuming little mixing, the PUREX cladding waste solids would be the top layer. Core analyses (Simpson et al 1993a(Simpson et al , 1993b suggest that mixing of the layers occurred.…”
Section: 1mentioning
confidence: 99%
“…Waste in C-112 was sampled first with cores 35 and 36 taken from near the inlet and core 34 taken from the opposite 2.2 side of the tank (Simpson et al 1993a). From C-109, cores 47 and 48 were taken from near the waste inlet, and core 49 was taken from the opposite side (Simpson et al 1993b). …”
Section: Sampling and Analysis Strategy For Wastes From C-112 And C-109mentioning
confidence: 99%
See 2 more Smart Citations