1995
DOI: 10.2172/274205
|View full text |Cite
|
Sign up to set email alerts
|

Tank 241-SX-108 auger sampling and analysis plan

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

1996
1996
1996
1996

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(5 citation statements)
references
References 1 publication
0
5
0
Order By: Relevance
“…The requirements of the three data quality objectives (DQOs) were integrated by the Tank 241-a-108 Auger Sampling and Analysis Plan (Eggers 1995a). …”
Section: Wastementioning
confidence: 99%
See 4 more Smart Citations
“…The requirements of the three data quality objectives (DQOs) were integrated by the Tank 241-a-108 Auger Sampling and Analysis Plan (Eggers 1995a). …”
Section: Wastementioning
confidence: 99%
“…Analyses required by the historical DQO included bulk density, energetics, and moisture content, in addition to metal concentrations by inductively coupled plasma (ICP), anion concentrations by ion chromatography spectroscopy (IC), total organic carbon (TOC) by persulfate and coulometry, uranium by phosphorescence, and total beta analysis (Eggers 1995a). Bulk density measurements were not carried out, because the sample material was very dry and flighty and because some individual samples produced radiological dose rates exceeding 90 Whr.…”
Section: ~~mentioning
confidence: 99%
See 3 more Smart Citations