Systemic integrated method for assessing factors affecting construction timelines

Abstract: Abstract. To streamline construction planning, one needs to assess and perform trial modeling of organizational and process-related factors impacting the final planned performance indicators. A proper calendar plan, one that would take due account of said factors, has a substantial impact on the efficiency and, sometimes, even the feasibility of a construction project as a whole. Therefore, the purpose of this paper's research is to develop a method for determining optimum technical and economic parameters. A … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
7
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
9
1

Relationship

1
9

Authors

Journals

citations
Cited by 25 publications
(7 citation statements)
references
References 7 publications
0
7
0
Order By: Relevance
“…Despite the fact that the process of mastering advanced technologies for thermal protection of buildings began a long time ago, the problem of manufacturing defects when performing work on insulation and finishing of facades, as before, remains one of the most important problems of modern construction. Moreover, if at the initial stage of introducing thermal insulation systems for external enclosing structures into domestic construction practice, a mass marriage could be attributed to imperfect technologies or a lack of professionalism of installers, today the unsatisfactory quality of facades is a consequence of a series of mistakes made by participants in the architectural and construction process at various stages of project [9,10]. This is largely due to the developing and immature construction market, in which dozens of companies have appeared that supply systems for protective and decorative finishing of buildings, and contractors that provide installation services, among which there are many companies whose main principle of production and commercial activity is to obtain profits by any means, including by saving on high-quality building materials, non-compliance with the production technology, low level of organization of construction production.…”
Section: Resultsmentioning
confidence: 99%
“…Despite the fact that the process of mastering advanced technologies for thermal protection of buildings began a long time ago, the problem of manufacturing defects when performing work on insulation and finishing of facades, as before, remains one of the most important problems of modern construction. Moreover, if at the initial stage of introducing thermal insulation systems for external enclosing structures into domestic construction practice, a mass marriage could be attributed to imperfect technologies or a lack of professionalism of installers, today the unsatisfactory quality of facades is a consequence of a series of mistakes made by participants in the architectural and construction process at various stages of project [9,10]. This is largely due to the developing and immature construction market, in which dozens of companies have appeared that supply systems for protective and decorative finishing of buildings, and contractors that provide installation services, among which there are many companies whose main principle of production and commercial activity is to obtain profits by any means, including by saving on high-quality building materials, non-compliance with the production technology, low level of organization of construction production.…”
Section: Resultsmentioning
confidence: 99%
“…As a matter of priority, it is important to specify the firm's main resources (equipment), give them an expert assessment and, using the model (1), identify the construction firm's resource potential indicator [15,16,17] for subsequent evaluation of its sustainability.…”
Section: Methodsmentioning
confidence: 99%
“…The research part, in turn, consists of [8,9,10,11,14,15]: -Visual and instrumental examination; -Laboratory research; -Analysis of project, working and performing documentation; -Analysis of organizational and technological documentation; -Analysis of estimated calculations (cost expertise); -Geodetic surveys; -Carrying out verification constructive calculations. The final part of the expert's conclusion is the conclusions, where the answers to the questions put to them are briefly given.…”
Section: Methodsmentioning
confidence: 99%