Systematic Approach to Optimize the Rig Move within ADCO Onshore Field

Abstract: ADCO's Business Plan demands a high number of wells to be delivered in development Fields for better reservoir sweeping efficiency such as: Infill drilling, injector's patterns and maintenance work-over operations in the end of each year, that result in increase of 50% of rigs fleet to meet the DWS (Drilling work over schedule) requirements in the next 5 years because the expansion in production will be from 1.4 MM bpd to 1.8 MM bpd. The rig move is an important component in the DWS as the average rig move bet… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Falex (2009) proposed a GA to the drilling rig scheduling problem with heterogeneous fleet that minimizes the rig's hires and oil production loss. Addressing a real case study of an Emirati oil company, Sumaida et al (2013) presented a systematic methodology for manually routing onshore rigs. Amrideswaran et al (2015) presented a framework for risk assessment in workover and plug and abandonment (P&A) operations in which offshore rigs are scheduled according to a GH, based on a priority ranking matrix.…”
Section: 41mentioning
confidence: 99%
“…Falex (2009) proposed a GA to the drilling rig scheduling problem with heterogeneous fleet that minimizes the rig's hires and oil production loss. Addressing a real case study of an Emirati oil company, Sumaida et al (2013) presented a systematic methodology for manually routing onshore rigs. Amrideswaran et al (2015) presented a framework for risk assessment in workover and plug and abandonment (P&A) operations in which offshore rigs are scheduled according to a GH, based on a priority ranking matrix.…”
Section: 41mentioning
confidence: 99%