All Days 1999
DOI: 10.2118/52808-ms
|View full text |Cite
|
Sign up to set email alerts
|

System for Drilling an Offshore Shallow Sour Gas Carbonate Reservoir

Abstract: This paper was prepared for presentation at the 1999 SPE/IADC Drilling Conference held in Amsterdam, Holland, 9-11 March 1999.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2006
2006
2015
2015

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 4 publications
0
3
0
Order By: Relevance
“…3 Reservoir rock samples taken from the first few exploration wells also indicated the presence of friable, chalky-textured formation especially at the top of the producing formation. The severe lost circulation problems encountered while drilling the initial exploration and delineation wells offered the first clues that the NSO formation may have limited mechanical strength.…”
Section: Rock Compressibilitymentioning
confidence: 98%
See 1 more Smart Citation
“…3 Reservoir rock samples taken from the first few exploration wells also indicated the presence of friable, chalky-textured formation especially at the top of the producing formation. The severe lost circulation problems encountered while drilling the initial exploration and delineation wells offered the first clues that the NSO formation may have limited mechanical strength.…”
Section: Rock Compressibilitymentioning
confidence: 98%
“…3 One of the wells, P-5, is drilled vertically and the other eight wells are highly deviated or horizontal wells. 3 One of the wells, P-5, is drilled vertically and the other eight wells are highly deviated or horizontal wells.…”
Section: Introductionmentioning
confidence: 99%
“…Quitzau et al (18) describe significant efficiency improvements applying PMCD during development phase of a project where the average duration per well was 4.7 days compared with 15.6 days during the exploration phase (drilled conventionally) Brainard (9) describes a Monte Carlo based simulation methodology employed to access the potential value of various MPD techniques applied to drill a deepwater GOM well. Although the paper does not present potential time savings, it does present the potential cost savings.…”
Section: Potential Efficienciesmentioning
confidence: 99%