completion of the run, temperatures, pressures, and amperages are read regularly at 15-minute intervals.The furnace is leveled out or placed on stream at the desired temperature by cutting resistance into the furnace circuit. The salt bath temperature is adjusted and maintained within ±3°F. of the separator temperature. Operation is maintained constant throughout the system for at least 15 minutes. Just prior to sampling, the drawoff lines are flushed.