2021
DOI: 10.23939/jeecs2021.01.032
|View full text |Cite
|
Sign up to set email alerts
|

Switching 300 MW Power-Generating Units with Gas-and-Oil-Fired Boilers to Increased Load Mode

Abstract: The goal of the research is to develop the guidelines for increasing the capacity of the operating 300 MW power-generating units by using the allowances assumed at the design computations and manufacture of the power-generating equipment, while preserving its reliability criteria and performance efficiency. The capacity of the operating power-generating units is increased in three stages. During the first stage, the technical state and operation conditions are established, measures aimed at increasing the capa… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 10 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?