All Days 2002
DOI: 10.2118/78312-ms
|View full text |Cite
|
Sign up to set email alerts
|

Swelling Packer for Zonal Isolation in Open Hole Screen Completions

Abstract: Open hole screen completions are efficient in installation and reliable in use if designed properly. The major weakness of Open Hole screen completions have been lack of zonal isolation. An Open Hole Zonal Isolation packer has been developed and installed in 5 wells with up to 14 packers per well. No downtime, operational time or installation failures were experienced. The packer construction is based on the swelling properties of rubbers with crude oil. Introduction … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2005
2005
2024
2024

Publication Types

Select...
5
3

Relationship

1
7

Authors

Journals

citations
Cited by 29 publications
(7 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…Each method is effective in shutting off only specific water paths, and they could be classified into two types: Mechanical methods involve placing a tool of high mechanical strength or cement into the wellbore to shut off the unwanted water source. The mechanical tools involve retrievable and straddle packers, plugs, tubing patches, and squeeze cementing. They are preferred for treating near wellbore problems such as channels behind casing or casing and tubing leaks. The advantage of the mechanical methods is that the effect will appear in a short time and is relatively inexpensive compared to other solutions. , However, they are not feasible for treating reservoir-related sources such as fractures or high permeability zones .…”
Section: History Of Water Problemmentioning
confidence: 99%
“…Each method is effective in shutting off only specific water paths, and they could be classified into two types: Mechanical methods involve placing a tool of high mechanical strength or cement into the wellbore to shut off the unwanted water source. The mechanical tools involve retrievable and straddle packers, plugs, tubing patches, and squeeze cementing. They are preferred for treating near wellbore problems such as channels behind casing or casing and tubing leaks. The advantage of the mechanical methods is that the effect will appear in a short time and is relatively inexpensive compared to other solutions. , However, they are not feasible for treating reservoir-related sources such as fractures or high permeability zones .…”
Section: History Of Water Problemmentioning
confidence: 99%
“…Openhole packers are utilized to isolate sections of the reservoir (Freyer and Huse 2002). Isolation aids to block production of undesirable fluids, such as water in the production interval or shale sections where risk of formation collapse may result in plugged completion equipment.…”
Section: Zonal Isolation Equipmentmentioning
confidence: 99%
“…Wells [Freyer and Huse, 2002]. The packers are configured with one large element that can be deformed easily to contact the uneven surface of the drilled hole, yet retain strength and sufficient integrity to withstand the anticipated differential pressures and temperatures.…”
Section: Zonal Isolation and Height Diversion Challenges -Open Hole Wmentioning
confidence: 99%