2014
DOI: 10.1016/j.jclepro.2014.07.025
|View full text |Cite
|
Sign up to set email alerts
|

Sustainable performance oriented operational decision-making of single machine systems with deterministic product arrival time

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
31
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 65 publications
(32 citation statements)
references
References 30 publications
0
31
0
Order By: Relevance
“…The attributes in this category are "machine turn on" (e.g., Shrouf et al, 2014), "machine idle" (e.g., Luo et al, 2013), "machine setup" (e.g., Eren & Gautam, 2011), "machine turn off" (e.g., Liu et al, 2014b), and "material storage" (e.g., Halim & Srinivasan, 2009). The first four attributes represent certain states of machines (PUs), each of which is associated with an individual demand for energy.…”
Section: Energy Demandmentioning
confidence: 99%
“…The attributes in this category are "machine turn on" (e.g., Shrouf et al, 2014), "machine idle" (e.g., Luo et al, 2013), "machine setup" (e.g., Eren & Gautam, 2011), "machine turn off" (e.g., Liu et al, 2014b), and "material storage" (e.g., Halim & Srinivasan, 2009). The first four attributes represent certain states of machines (PUs), each of which is associated with an individual demand for energy.…”
Section: Energy Demandmentioning
confidence: 99%
“…Except software package service as programming solver, MP-based approaches observed in the field of three targeted fields are as follows: Branch-and-Bound [34], Branch-and-Cut [146], Branch-and-Price [219], Branch-and-Cut-and-Price [142], Dynamic Programming [220], Lagrangian Relaxation [221], Column Generation [222], Set Partitioning [223], Constraint Programming [224], Goal Programming [225], Set Covering [226], and so forth. As shown in Table 1, it can be observed that the most frequently used mathematical programming-based method in the field of scheduling is B&B (Branch-and-Bound), while B&P (Branch-and-Price) is the most popular branching method in the field of VRP.…”
Section: Mathematical Programming-based Approachesmentioning
confidence: 99%
“…In seven publications assigned to production planning no economic indicators were used. Publications that did not use an economic indicator in production planning, focused on balancing between either energy consumption and total completion time (Mansouri et al 2016;Yildirim and Mouzon 2012;Mouzon et al 2007), energy consumption and tardiness (Liu et al 2014b), carbon emissions and total completion time (Liu et al 2014a), or focused on environmental indicators objectives only in pinch analysis (Geldermann et al 2006(Geldermann et al , 2007. In some publications two economic indicators are used simultaneously, e.g.…”
Section: Key Performance Indicatorsmentioning
confidence: 99%