2021
DOI: 10.1016/j.jclepro.2021.126717
|View full text |Cite
|
Sign up to set email alerts
|

Sustainable construction and demolition waste management in Somaliland: Regulatory barriers lead to technical and environmental barriers

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

7
57
0
2

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 65 publications
(66 citation statements)
references
References 32 publications
7
57
0
2
Order By: Relevance
“…Although this impact is not as strong as economic and social impacts, it has a medium to large effect on the overall model, which is consistent with the findings of [44]. Factors such as environmental pollution, environmental impacts of landfilled waste, and detrimental impacts of illegal waste dumping have been proven effective in WMH in many studies [10,114].…”
Section: Synthesis Of Empirical Findingssupporting
confidence: 75%
See 3 more Smart Citations
“…Although this impact is not as strong as economic and social impacts, it has a medium to large effect on the overall model, which is consistent with the findings of [44]. Factors such as environmental pollution, environmental impacts of landfilled waste, and detrimental impacts of illegal waste dumping have been proven effective in WMH in many studies [10,114].…”
Section: Synthesis Of Empirical Findingssupporting
confidence: 75%
“…A significant obstacle to the development and implementation of SCDWM practices is the presumption that these practices result in the augmentation of project costs [10,24]. Lockrey, Nguyen, Crossin and Verghese [56] highlighted the role of contractors' limited knowledge, awareness, and inadequate community involvement as the main barriers to implementing SCDWM practices.…”
Section: Social Aspect Of Cdwmmentioning
confidence: 99%
See 2 more Smart Citations
“…We sought an idea from a professional with at least 20 years of working experience in construction management and who has participated in many construction projects in which he experienced construction first-hand information. [37,38] Time pressure [39,40] Difficulties for delivery vehicles accessing construction sites [41,42] 2 Transportation problem [43,44] Lack of supervision [45] Inefficient method of unloading [46,47] 3 Incorrect Procurement [48,49] Lack of on-site waste management plans [50,51] Insufficient protections during unloading [50,52] 4 Lack of design standards for reducing construction waste [53,54] Use of incorrect material requiring replacement [54,55] Waste resulting from cutting uneconomical shapes [56,57] 5 Low cost for construction waste disposal [58,59] Poor craftsmanship [60,61] Damage to materials on-site [62] 6…”
Section: Waste Reduction Hierarchy On 3r (Reduce Reuse and Recycle)mentioning
confidence: 99%