Proceedings of the 8th World Construction Symposium 2019
DOI: 10.31705/wcs.2019.54
|View full text |Cite
|
Sign up to set email alerts
|

Suitability of traditional Procurement system for green Buildings in Sri Lanka

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…These selection criteria are inequitably challenged by various issues during design, construction, transportation, installation and operation (Rashid et al , 2016). In the context of Sri Lanka, a number of studies have been carried out with regard to procurement methods and their efficacious use in challenging contexts (Rubasinghe et al ., 2019; Dabarera et al ., 2019). The procurement methods discussed in these studies mainly fall under traditional measure and pay, design and built, turnkey and public-private partnerships.…”
Section: Literature Reviewmentioning
confidence: 99%
“…These selection criteria are inequitably challenged by various issues during design, construction, transportation, installation and operation (Rashid et al , 2016). In the context of Sri Lanka, a number of studies have been carried out with regard to procurement methods and their efficacious use in challenging contexts (Rubasinghe et al ., 2019; Dabarera et al ., 2019). The procurement methods discussed in these studies mainly fall under traditional measure and pay, design and built, turnkey and public-private partnerships.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Construction procurement has expanded over the years as separated, integrated, and managementoriented (Masterman and Masterman, 2013), which is later on classified as traditional, design and build (D&B), management related, and collaborative (Jaafar and Nuruddin, 2012;Rahmani, et al, 2017). Among the variety of available construction procurement systems, D&B is the widely used procurement method to ascertain sustainable construction requirements Rubasinghe et al, 2019). It is an effective project delivery method, that is practised with a single entity for both the design and construction phases of a project (Xia and Chan, 2012).…”
Section: Introductionmentioning
confidence: 99%