2019
DOI: 10.1051/matecconf/201928001006
|View full text |Cite
|
Sign up to set email alerts
|

Suitability Conservation Types Analysis of Panglima Besar Soedirman Reservoir

Abstract: Mrica Reservoir located in Banjarnegara Regency is amultipurpose reservoir. Based on the report of PT Indonesia Power UnitPembangkitan (UP) Mrica in 2016, the sediment of Mrica Reservoir hasentered the critical phase as it reached 114.25 million m3 and the value ofland-cover index of Mrica reservoir was 80% of the total watershed areawith the average sedimentation rate reaching 4.09 million m3 per year. Itis estimated that the reservoir will be full of sediment by 2021. The maincause of the high rate of sedime… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…The Soedirman Dam, often referred to as the Mrica Dam, was built in 1988 for a Hydroelectric Power Plant by damming the Serayu River [1][2][3]. The flow of the Serayu River before entering the Mrica Dam is fed by two other major rivers, namely the Merawu River and the Begaluh River [4,5]. In addition, the Mrica Dam functions as irrigation and a place for fish farming [6].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The Soedirman Dam, often referred to as the Mrica Dam, was built in 1988 for a Hydroelectric Power Plant by damming the Serayu River [1][2][3]. The flow of the Serayu River before entering the Mrica Dam is fed by two other major rivers, namely the Merawu River and the Begaluh River [4,5]. In addition, the Mrica Dam functions as irrigation and a place for fish farming [6].…”
Section: Introductionmentioning
confidence: 99%
“…The practical operational life of the Mrica reservoir is predicted to reach 50 years since it was built. However, in only about 26 years since the inauguration, the symptoms of siltation have become more evident due to the high level of sedimentation-erosion in the Serayu River Basin, and it is estimated that the operational age is only 4-7 years away [5,6].…”
Section: Introductionmentioning
confidence: 99%