Day 4 Thu, April 27, 2017 2017
DOI: 10.2118/188108-ms
|View full text |Cite
|
Sign up to set email alerts
|

Successful Debottlenecking of a Surface Injection Facility

Abstract: This paper will present a dedicated field case study that shows effective optimization of injection facilities obtained by hydraulic simulation. Water Injection Plants (WIPs) in the fields under study are operated as a secondary oil recovery method by means of peripheral injection. Field production strategy dictates water injection requirements in a given field. A core area of Field-A was identified with a need for increased injection pressure support. However, existing injection facilities could not meet the … Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles