All Days 2013
DOI: 10.2118/163927-ms
|View full text |Cite
|
Sign up to set email alerts
|

Successful Coiled-Tubing Application for Milling, Cleanout, and Kickoff Operations of Horizontal Wells Completed with Liner for Multistage Hydraulic Fracturing Project on Priobskoe Oil Field

Abstract: Historically, coiled tubing (CT) services were positioned as highly tailored services in Russian Federation. Main operations for CT application were post-frac cleanouts (CO) and kick-off (KO) of vertical and slightly deviated wells. Lately, with increasing of horizontal wells quantity, CT application scope became wider: logging, perforating, fishing jobs, CO, milling and other operations. With increasing interest to multi-stage hydraulic fracturing technology, Coiled Tubing application has to grow to meet clie… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2014
2014
2016
2016

Publication Types

Select...
5

Relationship

2
3

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 13 publications
0
3
0
Order By: Relevance
“…Other operators have opted for well patterns by drilling horizontal wells along the maximum stress to achieve longitudinal fractures (6,20) . Figure 11 below shows the optimum pattern consisted of horizontal production wellbores and vertical water injectors as result of sector modeling for long-term strategy aiming at maximum recovery.…”
Section: Spe-176720-msmentioning
confidence: 99%
See 1 more Smart Citation
“…Other operators have opted for well patterns by drilling horizontal wells along the maximum stress to achieve longitudinal fractures (6,20) . Figure 11 below shows the optimum pattern consisted of horizontal production wellbores and vertical water injectors as result of sector modeling for long-term strategy aiming at maximum recovery.…”
Section: Spe-176720-msmentioning
confidence: 99%
“…This has been proven for West Siberia conditions in synthetic models ( Figure 12) as well as measured in practice ( Figure 13) in current vertical well completion patterns. (20) Figure 12-Stress azimuth change under active production and water injection (12) Some of the operators have incorporated the latest information on the fracture orientation change into their potential patented FDP process as shown in Figure 14.…”
Section: Spe-176720-msmentioning
confidence: 99%
“…2 High water cut was obtained almost immediately after well completion with MSF system and during well testing. Complex operation was done afterwards with the use of CT to cleanout, kick-off, balls and seats milling.…”
Section: Spe-171268-msmentioning
confidence: 99%