SPE Asia Pacific Oil and Gas Conference and Exhibition 2008
DOI: 10.2118/114961-ms
|View full text |Cite
|
Sign up to set email alerts
|

Successful Case History of a Novel Open-Hole Horizontal Well Completion in Saudi Arabia

Abstract: Horizontal completion technology has progressed dramatically over the last six years, with the latest technical barriers being eclipsed with open-hole technology. These completions have allowed multiple zones to be fractured and the benefits of utilizing open-hole horizontal completion technology have been well documented. The efficiencies and benefits of utilizing open-hole completion with mechanical isolation, has lead to the operational benefits of multiple fracturing operations being pumped in one continuo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
5
0

Year Published

2010
2010
2011
2011

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 11 publications
(6 reference statements)
0
5
0
Order By: Relevance
“…As of September 2010, over 5,200 OHMS have been run worldwide in hundreds of formations, both on and offshore, proving the versatility of these systems (Al-Naimi et al, 2008;Saldungaray et al, 2008;Samuelson et al, 2008;Solares et al, 2008;Achi et al, 2009;Bukovac et al, 2009;Casero et al, 2009;Desai et al, 2009;Lee et al, 2009). Figure 11.…”
Section: Discussionmentioning
confidence: 99%
“…As of September 2010, over 5,200 OHMS have been run worldwide in hundreds of formations, both on and offshore, proving the versatility of these systems (Al-Naimi et al, 2008;Saldungaray et al, 2008;Samuelson et al, 2008;Solares et al, 2008;Achi et al, 2009;Bukovac et al, 2009;Casero et al, 2009;Desai et al, 2009;Lee et al, 2009). Figure 11.…”
Section: Discussionmentioning
confidence: 99%
“…As of March 2010, over 4,500 OHMS have been run worldwide in a variety of formations, both on and offshore, proving the versatility of these systems (Al-Naimi et al, 2008;Saldungaray et al, 2008;Samuelson et al, 2008;Solares et al, 2008;Achi et al, 2009;Bukovac et al, 2009;Casero et al, 2009;Desai et al, 2009;Lee et al, 2009). Figure 6.…”
Section: Discussionmentioning
confidence: 99%
“…This trend is still increasing in a direction which would indicate that optimization of multi-stage completions has yet to be fully realized. As of September 2010, over 5,200 OHMS have been run worldwide in a variety of formations, both on and offshore, proving the versatility of these systems (Al-Naimi et al, 2008;Saldungaray et al, 2008;Samuelson et al, 2008;Solares et al, 2008;Achi et al, 2009;Bukovac et al, 2009;Casero et al, 2009;Desai et al, 2009;Lee et al, 2009 Figure 1. Resource triangle (modified from Masters, 1979 andMiskimins, 2008).…”
Section: Discussionmentioning
confidence: 99%