2012
DOI: 10.1016/j.sbspro.2012.02.076
|View full text |Cite
|
Sign up to set email alerts
|

Success Factors of Design and Build Projects in Public Universities

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
16
1

Year Published

2014
2014
2022
2022

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 12 publications
(17 citation statements)
references
References 18 publications
0
16
1
Order By: Relevance
“…Several partial differences were noticed between the findings of this study and previous researches on the success factor of team effectiveness. On this factor, Adnan et al (2012) and Aristo (2017) reported that commitment of project's team members was one of project's success factors, which none can be found in the current study, especially under the theme of project's team performances. This shows a limitation of this study, since recruiting interviewees was extremely difficult, therefore in each projects, a specific role was only represented by one consented participant.…”
Section: Discussioncontrasting
confidence: 75%
See 1 more Smart Citation
“…Several partial differences were noticed between the findings of this study and previous researches on the success factor of team effectiveness. On this factor, Adnan et al (2012) and Aristo (2017) reported that commitment of project's team members was one of project's success factors, which none can be found in the current study, especially under the theme of project's team performances. This shows a limitation of this study, since recruiting interviewees was extremely difficult, therefore in each projects, a specific role was only represented by one consented participant.…”
Section: Discussioncontrasting
confidence: 75%
“…Experts, project's professionals, skillful technicians, and laborers are some of essential human resources that should exist to design, plan, manage other resources, which fall into finance, facilities, and equipment categories (Isik, Arditi, Dikmen, & Birgonul, 2010;Plant & Willcocks, 2007). In addition, among these human capitals were expected to have clarity in communication, shared roles and responsibilities, and also high level of commitment in order to reach targeted project's outputs and outcomes (Adnan, Bachik, Supardi & Marhani, 2012;Aristo, 2017).…”
Section: Project's Success Factorsmentioning
confidence: 99%
“…Another advantage of design-build system compared to conventional system is obviously timing. This is known as fast-track system, a system where a pre-contract and contract stages are executed simultaneously [5]. Potter and Sanvindo [6] conducted a study on the use of proper designbuild method.…”
Section: Introductionmentioning
confidence: 99%
“…Project owner's inability to determine specifically the requirements for the quality regarding construction work is caused by the owner's full dependency on the contractor [1]. In addition, compared with the conventional system, in Design-Build system the contractor is the sole party in charge of the project, the risk taker, and the design and construction management in deciding project cost as well as the use of sources which are not economical [5]. Ashworth [9] confirmed that the disadvantage of design-build method is higher project cost and lack of flexibility in variation [10,11].…”
Section: Introductionmentioning
confidence: 99%