Subway station construction using combined shield and shallow tunnelling method: Case study of Gaojiayuan station in Beijing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
8
1

Relationship

2
7

Authors

Journals

citations
Cited by 51 publications
(13 citation statements)
references
References 13 publications
0
13
0
Order By: Relevance
“…is paper used a centrifugal model test and finite element analysis to simulate the construction process of the HZMB's (Hong Kong-Zhuhai-Macao Bridge) K9 + 600 section of an immersed tunnel with a weak foundation. e stress and strain characteristics of the excavated backfill base and the deformation characteristics of the immersed tunnel structure were studied, providing some basis for engineering design [71][72][73][74][75][76][77]. e concrete results are as follows:…”
Section: Discussionmentioning
confidence: 99%
“…is paper used a centrifugal model test and finite element analysis to simulate the construction process of the HZMB's (Hong Kong-Zhuhai-Macao Bridge) K9 + 600 section of an immersed tunnel with a weak foundation. e stress and strain characteristics of the excavated backfill base and the deformation characteristics of the immersed tunnel structure were studied, providing some basis for engineering design [71][72][73][74][75][76][77]. e concrete results are as follows:…”
Section: Discussionmentioning
confidence: 99%
“…According to equation (16), adopting steel fiber concrete can improve the bond characteristic of the interface (σ 24hb ) and thus increases the safety distance of shotcrete. (2) Operation sequences in tunnel excavation can be ordered to reduce blast charge and therefore significantly controls blast vibration [21,44]. A certain distance should be kept between upper and lower benches to keep the shotcrete from being repeatedly disturbed by blasting in a short time.…”
Section: Recommendations For the Security Of Shotcretementioning
confidence: 99%
“…The simulation value has the same trend as the field monitoring value, as shown in Figure 13. At the beginning (stage [13][14][15][16][17][18][19][20][21][22][23][24], with the excavation at point A (stage 13), the settlement of the arch at point A in Z direction changes more rapidly, which is caused by the disturbance of lining structures when excavation. Then, with the continuous excavation (25-36 stages), the disturbance of point A in the subsequent excavation process decreases gradually, and the settlement of point A in Z direction tends to be stable.…”
Section: Fig 13 -Comparison Of Simulation Value and Monitoring Valuementioning
confidence: 99%
“…However, with the development of BIM technology, its modeling method has not been improved greatly. As an underground project, tunnels have higher complexity than above-ground buildings, and the traditional modeling method for buildings is not suitable to the tunnel BIM [20]. Thus, it is necessary to study the modeling methods applicable to tunnel BIM [21][22][23].…”
Section: Introductionmentioning
confidence: 99%